
Then it was time to test all parts, some of the parts sat as glued at some points and with quite a lot of flex on the other. I have decided to join the bottom two lines stringers on each side when they were to bumpy. Also noticed too many small branches. Branches did not appear to be a problem when the planks were 200 x 22 mm but cutted to 19 x 19 mm they were large enough to crack the whole string.

The absolute bottom stringer must be mounted when I removed the kayak from strongback when the bracket for the cross section 1 and 6 are in the way. It had not been possible to make the bracket for the Section 6 narrower.
No comments:
Post a Comment