Epoxy is messy!
Then the hull was almost completely glued together, the bottom stringer must be glued when I have lift it from the strongback. The bow is also left to glue.
In the case of epoxy, I will next time buy smaller packages whit a pump. I believe that I have used more than maybe 100-150 grams epoxy to the building + 400 grams mess because jar packaging.
Then the hull was almost completely glued together, the bottom stringer must be glued when I have lift it from the strongback. The bow is also left to glue.
In the case of epoxy, I will next time buy smaller packages whit a pump. I believe that I have used more than maybe 100-150 grams epoxy to the building + 400 grams mess because jar packaging.
Many cable ties. I first clamp the stringer whit a clamp and then "secure" it with cable ties, it seemed like a good solution.
No comments:
Post a Comment